Real-Time Tracking
Sunrise identifies component features in real-time, verifies placement within tolerance, and confirms accuracy before fastening, eliminating human error from the assembly sequence.
The Sunrise™ Factory
Materials prepped and loaded for assembly
Autonomous bay assembly
Bay delivery and installation
QA/QC data logged for every module


Charge handles all material prep and loading, from unbundling torque tubes to loading modules and mounting brackets.
The dual-track conveyor system precisely moves, orients, and positions torque tubes for assembly.
The sheltered main bay assembly line is flexibly programmed to build dozens of bay configurations.
Assembled bays of 5–9 modules are transported and installed on piles as complete units.
Charge automates all structural assembly, from factory loading through row installation and QA/QC Handoff. EPC retains responsibility for civil prep and electrical balance-of-system work.

Sunrise identifies component features in real-time, verifies placement within tolerance, and confirms accuracy before fastening, eliminating human error from the assembly sequence.
Every fastening operation logs torque measurements, serial numbers, timestamps, and placement images, creating a complete record for traceability and serviceability.
Our Standards

Charge provides a trained crew to operate each Sunrise factory, reducing the overhead of hiring a crew to work in remote locations.

By automating 75% of array assembly and installation, Charge reduces the exposure and costs of a large manual crew.

Robotic arms handle all component movement, eliminating one of the leading causes of injury on a solar site.
